Projects are categorized by area/project and loosely organized by scale (major projects first). This page is a work-in-progress. Last updated on Tuesday, August 19th, 2025.
Basement Stairs
A long-overdue project – replacement of the basement stairs – was finally completed this spring. The old stairs were in significant disrepair. The project involved:
- Demolition of the old stairs.
- Additional waterproof sealing of the adjacent exterior block wall.
- Installation of a new staircase by a licensed carpenter.
- Application of exterior stain to protect the wood and resist water/dirt.
- Removal of the old, sagging drywall ceiling.
- Installation of three new recessed can lights and a new wall light fixture.
- Scraping, prep and painting of all walls.
- Installation of new crown molding.
- Removal, clean-up, staining and re-installation of the oak handrails. Thanks to Andy Mehelich for the assistance.
- Installation of an art piece to enhance the aesthetics.
Renovation Near Complete - May 2020 - 3 of 3
In the end, the new stairs are safer, cleaner, and far more aesthetically pleasing. The staircase area went from an eyesore to one of the best-looking areas of the clubhouse.
Clubhouse
- Installed a new filtered, refrigerated drinking fountain and bottle filler.
- Replaced the lobby TV with a larger 4K model. Thanks to Alan Zager for the donation.
- Installed two new JBL in-ceiling subwoofers to enhance the audio (music) quality.
- Installed new blinds on the “manager window” (facing the pool).
- Installed an additional (fourth) WiFi access point (AP) on the north end of the building.
- Repaired drywall damage in multiple areas. Thanks Tom and Heather Ciuffetelli and the Aiken family.
- Painted multiple exterior window trims. Thanks to Tony Arbini.
- Cleaned up wiring in the basement network rack.
- Added an additional phone in the basement.
- Installed custom moulding over the door in the women’s locker room.
- Installed a new microphone to enhance the clarity of announcements.
- Removed old anchors and patched holes in exterior brick.
- Deep cleaning and fin straightening on the Snack Shack condenser unit. Thanks Eric Meseroll for tackling this tricky job.
Games
- Re-built the fowling boards. Thanks to Patrick Droze for the carpentry and Lisa Vecellio for applying the exterior stain.
- Painted the cornhole boards. Thanks to Tony Arbini.
Grounds
- Constructed a new shed on the south end of the property for storage of yard games.
- Added an additional drain near the basketball courts.
- Repainted picnic tables. Thanks to Jennifer Kolbus and Mary Pacuraru.
- Removed a dead, fallen pine tree on the south end of the property. Thanks to Jeff Adams.
- Removed several dead boxwoods and other landscape cleanup in the front club parking lot entrance. Thanks to Christina Randall.
- Installed a solar-charged LED dusk-to-dawn light to illuminate the front entrance sign.
Small Pavilion
- Installed an additional camera.
- Converted attic cut-outs into removable access panels for easier maintenance. Thanks to Patrick Droze for the carpentry and Tony Arbini for painting.
Large Pavilion
- Installed three new cameras and supporting network infrastructure.
Snack Shack
- Removed the kitchen cabinets and replaced plumbing.
- Installed new cabinets and a portion of drywall board.
- Installed new countertops. Thanks to Bobby Votruba for cutting/fitting/installation.
- Completed additional paint and wall finishing/updates.
Pool and Pool Deck
- Repaired a major leak in the 6″ filtered-water return line to the pool.
- Replaced the static line (for enhanced monitoring to support pool water auto-fill).
- Removed and replaced concrete in three areas.
- Installed new floor drainage near the clubhouse door and along the large pavilion.
- Removed and re-installed perimeter fencing to support concrete replacement.
- Installed a new stand-alone pedestal footwash.
- Removed an old, rarely used drinking fountain.
Pump House
- Installed new 6″ pressure gauges on the sand filter tanks.
- Upgraded the automated dashboard PC (Raspberry Pi) from a Model 3B to a Model 5. Migrated to a new dashboard UI and upgraded all associated software packages.
- Installed a magnetic whiteboard on the south wall for maintenance communication.